Please wait...

72" 150psi Sour Horizontal Separator 3 Phase

bookmark_border Watch

Description

New, never-used 2014 Foremost Universal 72 in x 20 ft horizontal 3-phase separator, MAWP 150 psi at 130 °F, MDMT -40 °F, CRN W3976.21, housed in a heated metal-clad building.

General Info
Packager:
Bilton
Year Built:
2014
Service Type:
Sour
Condition Rating:
A — New, Unpackaged
Condition Details:
New, never used (Condition A). Nameplate year built 2014; photos date-stamped 14 May 2014.
Skidded:
Yes
Housed:
Yes
Connection Status:
Disconnected
Warranty:
No
Units Available:
1
Separator Info
Vessel Only:
No
Manufacturer:
Foremost Universal LP
Diameter:
72"
Separator Length:
20'
MAWP:
150psi
Max Temp:
130°F
Position:
Horizontal
Phases:
3 Phase
Serial #:
029307-1
CRN #:
W3976.21
Notes:

New, never-used 2014 horizontal 3-phase separator by Foremost Universal LP, 72 in x 20 ft and rated 150 psi at 130 °F with a -40 °F MDMT. The large diameter gives long liquid retention for low-pressure 3-phase separation, and the vessel is housed in a heated, metal-clad building with control valves, instrumentation and piping. It is registered in Alberta under CRN W3976.21.

Key Specs

- Type: horizontal 3-phase separator, housed package

- Size: 72 in x 20 ft

- Year built: 2014

- MAWP: 150 psi at 130 °F (1,034 kPa at 54 °C)

- MDMT: -40 °F at 150 psi (-40 °C at 1,034 kPa)

- Service: listed as sour

Nameplate / Registration

- Fabricator: Foremost Universal LP

- CRN: W3976.21 (ABSA directory: base design W3976.2, Foremost Universal LP, vessel, drawing EDS-6210)

- A number: 629241

- Serial: 029307-1

Condition

- Rated A (new, never used)

- Photographed new, date-stamped 14 May 2014

- Connection status: disconnected

What's Included

- Horizontal 3-phase separator

- Control valves, level gauge, instrumentation and piping

- Two building heaters

- Metal-clad building with door, windows and skid

Photos & Documents

- 18 photos: building exterior, building interior, vessel, control valves, instrumentation and nameplate

- No documents posted

Verification Recommendations

- Confirm sour-service design (NACE MR0175 / ISO 15156 materials)

- Request the U-1A data report to confirm the 2014 build year; the final digit on the nameplate is restamped

- Confirm building dimensions and shipping weight

- Confirm registration for the destination province if outside Alberta

Financial Info
Availability Status
Available
Location
Nearest Town / City
Nisku
Province
AB
Country
Canada
Share item via

Modular Buildings


There is no category.