275 bbl/d Condensate Stabilization Package (3 phase)
Supporting Documents (33)
library_books
Application Overview
Mechanical Flow
Mechanical Flow 2
Mechanical Flow 3
Layout / Assembly
Layout / Assembly 2
Condensate Stabilizer Tower - External Inspection (March 2018)
Condensate Stabilizer Tower - UT
Condensate Stabilizer Tower - U-1A (2009)
Condensate Stabilizer Tower - UT (2018)
Condensate Stabilizer Tower - UT (2012)
Condensate Stabilizer Tower - UT (2011)
Cooler - Data Sheet
Cooler - UT (2018)
Cooler - External Inspection (2018)
Cooler - UT (2015)
Cooler - UT (2)
Cooler - U-1A
Feed Bottom Heat Exchanger - External Inspection (March 2018)
Feed Bottom Heat Exchanger - UT
Feed Bottom Heat Exchanger - INFORM REPORT
Stabilizer Feed Separator - External Inspection (2018)
Stabilizer Feed Separator - UT (2018)
Stabilizer Feed Separator - U-1A
Stabilizer Feed Separator - UT (2011)
Stabilizer Feed Separator - UT (2012)
Stabilizer Feed Separator - UT
Stabilizer Feed Separator - U2 Report
Stabilizer Reboiler - External Inspection (2018)
Stabilizer Reboiler - INFORM REPORT
Stabilizer Reboiler - Internal Visual Inspection (2018)
Stabilizer Reboiler - Internal Visual Inspection - 2 (2018)
Stabilizer Reboiler - UT
file_download Download All in ZIP
Listing ID:
IH-15693
Internal
Notes:
The stabilizer is designed to handle 275 bbl/d (43.7 m3/d) of condensate at steady state when the plant is operating at 120 MMscfd (3400 E3m3/d). This includes a 10% contingency. The package has a minimum inlet flow of 137 bbl/d (21.9 m3 /d) of condensate. If thecondensate rate drops below this level the package will be operated in a batch mode until the minimum flow is reached again. The stabilizer tower can only be turned down to 2:1 and meet the guaranteed product spec from the vendor.
Note: The connective piping for the cooler is missing.
Share item via